This afternoon I spent almost two hours meeting with Scott Schmidt, the County's Highway Commissioner. It was a very informative meeting, and I am very thankful to Scott for dedicating so much time.
We discussed each of the 5 routes that I see as viable, and what the benefits and challenges of each route were. He also showed me maps and costing analysis for each of the routes that were looked at back in 2005, which included some southern options. We talked about the southern options, and the potential costs ($20 million in 2005 dollars, probably $30-$40 million in 2016 dollars) and challenges associated with these options.
I walked out with new concerns about the reliever route, and whether it makes sense from a cost/benefit perspective.
Based on our discussion, I have decided to eliminate route 1 from my priority list. That makes my current list:
- Route 4 (inside Hartford route)
- Route 7 (Arthur Road route)
- Route 9 (Exit Highway K, transition to Arthur Road)
- Route 11 (Highway K)